Project Phase

    Acceptance Supervision &
    Commissioning Support

    Manufacturer-independent supervision during acceptance of new filling lines – with objective performance measurement through CESAR from first test run to final handover.

    Objective performance measurement – independent of the OEM

    When accepting a new filling line, you often rely on the manufacturer's performance promises. But who measures independently whether the line actually achieves the guaranteed performance? With CESAR, you capture all relevant metrics objectively and independently from the very first test run.

    Our engineers accompany you through the entire acceptance process – from preparation through the Factory Acceptance Test (FAT) to final handover. You receive documented, traceable OEE metrics that serve as the basis for acceptance.

    Why independent acceptance?

    • Objective data instead of manufacturer promises
    • Early detection of performance deviations
    • Documented basis for acceptance protocols
    • Avoidance of costly renegotiations
    The Acceptance Process

    From first test run to final handover

    We accompany you in every phase of line acceptance with precise CESAR data capture.

    01

    Preparation & Sensors

    Installation of CESAR hardware before the first test run.

    • Mounting sensors on all machines
    • Connection to machine controls
    • Calibration and functional testing
    • Definition of measurement points with you
    02

    Factory Acceptance Test (FAT)

    Objective performance measurement during acceptance.

    • Real-time capture of all stops and micro-stops
    • Comparison of target vs. actual performance
    • Documentation of all changeover times
    • Live dashboard for all stakeholders
    03

    Performance Analysis

    Detailed evaluation of all collected data.

    • Identification of bottlenecks and weak points
    • Comparison across all machines
    • Detection of hidden losses
    • Prioritization of optimization measures
    04

    Handover Protocol

    Documented acceptance with OEE metrics.

    • Handover protocol with documented OEE values
    • Comparison with manufacturer guarantees
    • Recommendations for continuous operation
    • Seamless transition to continuous monitoring

    Your benefits with acceptance supervision

    Why bottlers worldwide trust FlowLine Consulting for line acceptance.

    Manufacturer Independence

    We work completely independently of the line manufacturer. You receive objective, unbiased measurement data – no vested interest in specific outcomes.

    Time Savings

    Early detection of problems saves weeks of renegotiation. Deviations are documented immediately during FAT, not weeks later.

    Documented Performance

    Every stop, every micro-stop, every changeover is precisely captured. You receive a complete, traceable protocol of line performance.

    Risk Minimization

    Avoid costly false acceptances. With CESAR data, you detect performance deficits before the line is finally handed over.

    Ready for acceptance?

    Secure your next line acceptance

    Contact us for a no-obligation consultation. We show you how independent CESAR measurement secures your acceptance.